Project Details

Project Name

Water Treatment Pretreatment Building and Pumping Stations Overview

Project Leader

Mohamed Alaa

Project description:

This project includes a 36 km GRP pipeline (1200 mm diameter) and three pumping stations, each equipped with dual pump sets handling flows of 257 l/s and 62.5 l/s at a 30 m head. The facilities include storage tanks (25,000 m³ each) and auxiliary buildings. The pretreatment building is designed to remove large debris, adjust water chemistry, and enhance treatment efficiency through processes such as screening, coagulation, sedimentation, filtration, and chemical treatments.

Project Images Gallery